Search results

Jump to: navigation, search
  • === [[OC4:OpenID Connect Interop 4|Fourth OpenID Connect Interop]]: June 2012-June 20 The [[OC4:OpenID Connect Interop 4|Fourth OpenID Connect Interop]] tested implementat
    9 KB (1,153 words) - 15:06, 5 June 2014
  • ...l page for the fourth [http://openid.net/connect/ OpenID Connect] interop (OC4), which is being conducted from June 2012 through the CIS conference in Jul ...x; border:1px solid gray; padding:0.7ex; background-color:white;">Category:OC4 Interop</categorytree>
    2 KB (326 words) - 19:13, 13 September 2012
  • The OC4 Interop contains two separate types of tests: Cross Solution Tests test general interoperability between two different solutions, with the goal of having every solution interact with every other solution,
    865 B (129 words) - 14:55, 21 June 2012